A Jupiter pool deck rebuilt with batch-matched porcelain over a mortar-set base with fully grouted joints for a seamless, low-maintenance finish.




Two rows of porcelain coping were already set by the pool contractor using Hardscape.com material. We coordinated directly with the supplier to source pavers from the exact same batch, then removed and realigned the second coping row to continue the pattern precisely.
The entire deck was installed over a mortar-set base so every joint could be grouted for a seamless, durable finish. Porcelain needs no sealing or re-sanding — just occasional cleaning — and we added a Deco Drain system to redirect gutter water and prevent puddling.
This was a paver pool deck project — see how we approach it.
Tell us the surface, the size, and your timeline. We’ll be at your door within a day or two, no charge, no pressure.